Olomouc – City Centre

Construction type
Автодорожное строительство

Financial volume
CZK 44,6 million

Commencement Date
2007

Completion deadline
2008

Investor
City of Olomouc

Designer
MORAVIA CONSULT Olomouc

Suppliers
OHL ŽS, a. s.

Load
 

The bridge takes the local road of the MO 7/30 category over the Morava river. The load-bearing construction of the bridge is made from an additionally pre-stressed reinforced-concrete floor in the form of a drawbar with two suspended steel arches. The total length of the bridge is 72.2 m, the span of the bay is 64.9 m, width 13.35 m, and the deflection is 8.8 m. The water-proofing of the bridge floor is carried out as a machine-applied polyurethane membrane.

 