Construction type
Surface Construction
Financial volume
CZK 471 million (excluding VAT)
Commencement Date
2004
Completion deadline
2005
Investor
The consortium of Skanska CZ a.s. and STRABAG a.s.
Designer
Nikodem a Partner spol. s r.o
Suppliers
OHL ŽS, a.s.
The departure lounge is situated on the ground floor and the arrivals lounge on the first floor.
The load-bearing structure is formed by a prefabricated reinforced-concrete frame completed with monolithic retaining walls. The core units of lift wells and staircases are made from ceramic blocks. The glassed areas of the departure lounge are supported with a thick steel structure located outside the lounge behind the plane of the glassed facade. The structure guarantees the stability of the glassed walls and transfers and dissipates pressure caused by strong wind.
OHL ŽS, a.s. secured the development of several structures, including related distribution systems and installations.