Construction type
Road Construction
Financial volume
CZK 1 209 million
Commencement Date
2002
Completion deadline
2005
Investor
Road and Motorway Directorate of the Czech Republic, Prague 4, Na Pankráci 546/56
Designer
Suppliers
Consortium of companies: ODS-Dopravní stavby Ostrava a. s. – leading member, Dopravní stavby Holding a. s. – member of the consortium, OHL ŽS, a. s. – member of the consortium
The total length of the route segment of this road construction is 5,650 m. It is a four-lane road of the R 22.2/100 category, with bituminous surface. Furthermore, the construction included B- and C-roads, local roads and multilevel junctions – 5 access ramps.
As a part of the contract, 8 reinforced-concrete bridges, 3 road flyovers, a steel foot-bridge, a subway, abutment and breast walls and anti-noise walls were built. Water-management structures – road drainage, diversion of a brook, diversion of a water pipeline, electro and telecommunication devices, diversion of high- and mean-pressure gas pipelines, soft landscaping and other related structures.